Public Works

Public Works Responsibilities

Our public works department is responsible for making sure that our city stays looking clean and beautiful. Without them no city event would be possible and Windcrest wouldn't look as mesmerizing as it does during the Windcrest Light-Up season

  • Alleys
  • Parks and Green Space
  • Amenity Maintenance
  • Street Repairs
  • Traffic Signs and Markings

Additional Information

For any of the following please contact the agency or representative:

  • Traffic Lights
    TxDot
    210-615-6058
  1. Road Work
  2. Mosquito Spray
  3. Storm Water

I-410 Interchange to Walzem Road

Northbound

  • Sep 5 - Sep 9 | 9:00 PM - 5:00 AM: Left lane closure on northbound and southbound main lanes of I-35 from Fratt Rd. to Weidner Rd. for utility work
  • Sep 5 - Sep 9 | 9:00 PM - 5:00 AM: Southbound to northbound turnaround closure at Walzem Rd. alternating lane closures on northbound frontage Rd. and alternating entrance and exit ramp closures of I-35 from Walzem Rd to Crestway Dr for striping and barrier work. Traffic should follow detour signs for available ramps.

Southbound

  • December 10 - Long-term | 24/7: Left lane closure on southbound frontage road of I-35 at Fratt Rd. for construction work.
  • Sep 5 - Sep 9 | 9:00 PM - 5:00 AM: Exit ramp closure on southbound main lanes and alternating lane closures on southbound frontage road of I-35 from Randolph Blvd. to Walzem Rd. for geotechnical, dilled shaft, and column work. Traffic to use next exit ramp.
  • Sep 5 - Sep 9 | 9:00 PM - 5:00 AM: Right lane closure on southbound main lanes of I-35 from Randolph Blvd. to Walzem Rd for cap work.
  • Sep 5 - Sep 9 | 9:00 PM - 5:00 AM: Entrance Ramp closure on southbound frontage rd of I-35 from Fratt Dr. to Walzem Rd. for dilled shaft, and column work. Traffic to use next exit ramp.
  • Sep 5 - Sep 9 | 9:00 PM - 5:00 AM: Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Sep 5 - Sep 9 | 9:00 PM - 5:00 AM: Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.